The work involved surface preparation and painting of HMS Westminster front bridge screen. The work was carried out using rope access technicians.
The work involved carrying out surface preparation to remove isolated corrosion areas back to the surface substrate, feathering back all edges to sound coatings leaving a surface standard ST3 in line with ISO 8501-1.